SUMMARY: The report provides a high level overview of the IPPPP and IPP Office activities for the latest available reporting period, including the contribution of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP).
KEY FINDING / RECOMMENDATIONS: The IRP 2019 calls for 37 696 MW of new and committed capacity to be added between by 2030 from a diverse mix of energy sources and technologies as ageing coal plants are decommissioned and the country transitions to a larger share of renewable energy. By 2030, the electricity generation mix is set to comprise 33 364 MW (42.6%) coal, 17 742 MW (22.7%) wind, 8 288 MW (10.6%) solar photovoltaic (PV), 6 830 MW (8.7%) gas or diesel, 5 000 MW (6.4%) energy storage, 4 600 MW (5.9%) hydro, 1 860 MW (2.4%) nuclear and 600 MW (0.8%) concentrating solar power (CSP).